Sunday, July 19, 2015

In situ


This morning we load the bar-table up and truck over the bridge to SF.  Legs and top get mated together, hopefully locked in union for many years.  The lobby of the new building is still under construction so I will come back and take some studied photographs of it in situ at a later date.

Ken attaching the leg assembly.
Doing some tightening of the bolts.
Dusting it off.




And another part of the same project.  The tables and benches in another part of the lobby.

No comments:

Post a Comment